Ensuring High-Availability in Gas Turbine Power Systems
Applying dynamic simulation during the design phase of gas turbine systems in order to minimize the occurrence of operating trips.
Applying dynamic simulation during the design phase of gas turbine systems in order to minimize the occurrence of operating trips.
Plan and follow-up operators’ professional development by digitizing and centralizing in a single training environment all new and old learning material.
Apply dynamic simulation to mitigate the impact of spurious upsets, which could affect the operability of your steam and electrical network.
Inprocess simulation analysis of the cooling water network helps companies to improve the performance of the plant. When this study is carried out, the result is that bottlenecks are identified and this way, the most critical points can be addressed with optimal solutions to improve the performance of the cooling water network …
During a flare release, the temperature of the flare network has a strong dependence on the relief source and on ambient conditions. During a relief of hot gases, contraction of the gases could occur due to the cool-down to ambient conditions. The rate of contraction velocity is accelerated if cooling leads to condensation of the contained gas components.
Generic Operator Training Simulators are extremely powerful training tools for acquiring the generic knowledge required by students and plant operators to understand the way complex producing units are operated from the plant control room consoles.
Mención: Mejor póster Reunión SNE 2020. Los métodos para la monitorización de tritio previstos en ITER consisten en detener periódicamente su operación para medir de la cantidad global de tritio en planta.
Plan and follow-up operators’ professional development by digitizing and centralizing in a single training environment all new and old learning material.
Plant operators need deep training before the greenfield plant is started-up. Moreover, companies need to diminish potential operational problems related to the equipment sizing, control logic and safety systems by performing early analysis during the engineering design phases.
Gas turbine power plants have to achieve high reliability and maximum availability in order to be able to meet the dispatch requirements of electric grids at short notice. The power generation systems are high-availability assets, generally above 90%.