Dynamic Simulation Study for a National Gas Grid and Emulated Operator Training System
Inprocess carried out a detailed concept study of the Gas Grid pipeline system to identify and evaluate all possible options available to meet all gas delivery specifications and Gas Grid capacity for a minimum of 10 years.

