Dynamic Analysis of the Turboexpander Dew Point Unit in a Gas Plant

Type of service:  Dynamic Simulation Study

Inprocess client:  Spanish EPC working for a Middle East Petroleum Company

Year:  2016

Country:  Middle East

Descripcion:

Inprocess delivered a Dynamic Simulation Study for a Turbo Expander/Residue Gas Compressor, for a Gas Plant Train in Middle East in order to confirm high operational safety and reliability of the system. Consequently, the project:

  • Verified the Instrumented Protection System (response of the antisurge control system / adequacy of the Turboexpander protections)
  • Confirmed the stable operation during start-up and shutdown with existing control scheme.
  • Validated the stable Turboexpander and Residue Gas Compressor operation under minimum – maximum loadings and response to flow rate variations.
  • Confirmed the  stable operation during sequencing for mode switching to / from JT mode.
  • Confirmed the adequacy of the overpressure protection system of the Demethaniser installed downstream of Turboexpander.

Process Interested? Don’t hesitate to ask for more information just completing the form below

Inprocess
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.