Ensuring the operability of a Turboexpander Dew Point Unit
Type of service: Engineering Design Studies
Inprocess client: Operating Companies and EPCs
Year: 2017
Country: Everywhere
Inprocess delivered a complete dynamic simulation model of the turboexpander for an EPC company. This simulation was key in testing several operational scenarios for various normal and upset conditions ant to ensure the operability of a Turboexpander Dew Point Unit. An Aspen HYSYS dynamic model of the unit was built and several operating scenarios were carried out which revealed some design issues that were possible to correct before unit commissioning. The main achievements of the project are:
• Adequate Equipment Sizing
• Understanding the transient behaviour of the unit
• Optimization of the PIDs tuning parameters
• Operating Procedures enhancement
• Testing of New Operating Procedures
• HAZOP limits confirmation
• Early risks identification resulted in cost reduction and prevented later unexpected modifications