Dynamic Analysis of the Turboexpander Dew Point Unit in a Gas Plant

Type of service:  Dynamic Simulation Study

Inprocess client:  Spanish EPC working for a Middle East Petroleum Company

Year:  2016

Country:  Middle East

Descripcion:

Inprocess delivered a Dynamic Simulation Study for a Turbo Expander/Residue Gas Compressor, for a Gas Plant Train in Middle East in order to confirm high operational safety and reliability of the system. Consequently, the project:

  • Verified the Instrumented Protection System (response of the antisurge control system / adequacy of the Turboexpander protections)
  • Confirmed the stable operation during start-up and shutdown with existing control scheme.
  • Validated the stable Turboexpander and Residue Gas Compressor operation under minimum – maximum loadings and response to flow rate variations.
  • Confirmed the  stable operation during sequencing for mode switching to / from JT mode.
  • Confirmed the adequacy of the overpressure protection system of the Demethaniser installed downstream of Turboexpander.

Process Interested? Don’t hesitate to ask for more information just completing the form below