Development of a direct-connect OTS for an FPSO offshore Brazil (Mero field)
Project type:
Operator Training System (OTS)
Project subtype:
DirectConnect OTS: Emerson-DeltaV
Client:
Instrumentation Provider for a Malaysian FPSO constructor
Proyect title:
Development of a direct-connect OTS for an FPSO offshore Brazil (Mero field)
Process simulator:
Aspen HYSYS
Starting year:
2022
Client country:
Malaysia
End user country:
Brazil
Company Type:
Instrumentation Provider
Industry:
Oil & Gas (FPSO)
Project Short Description:
Development of an OTS for an FPSO to be located in the Mero field, offshore Brazil. The system will be direct-connect using the software provided by Emerson in order to simulate the behavior of their DeltaV ICSS. The simulation of the processing facilities will be carried out with Aspen HYSYS Dynamics and Inprocess Infrastructure Suite will provide the Instructor capabilities of the tool, the data transmission among applications and the qualification of the students. A deep checkout of the ICSS database will be as well carried our as one of the phases of the OTS construction.
Dynamic Model Development of a Development of a direct-connect OTS for an FPSO offshore Brazil (Mero field) FPSO | Operator Training System (OTS) | Brazil – 2022 |