
Description:
The Phase I of the study was performed by Inprocess in order to determine the maximum possible operating capacity limits, by considering the safety limitation factors, when increasing well production.
Once capacity limits were determined, during project Phase II, Inprocess updated a series of simulation files provided by the client and it performed the hydraulic performance check for the non-licensed units, major lines and equipment in scope.