Lifecycle OTS: DCS Check-out

Ensure DCS database is error free before plant commissioning:

  • Use the plant model to check out and debug the configuration of the logic in the Distributed Control System
  • Also check out the logic implemented in the Emergency Shutdown system and the procedures in Automated Sequences
  • Decide the values of the alarms against simulated plant responses
  • Pre-tune control loops before commissioning
  • Check operability of HMI screens configuration