Loading...

Dynamic Flare Load Analysis

Description:

Plant expansion projects, unit revamps or debottlenecking studies may lead to a re-evaluation of the capacity of an asset existing flare system. Usually, after a re-evaluation study, an increase in flare load is determined. If the capacity of the asset flare system is close to its limit, the only solution is a capital project to increase the original capacity. Nevertheless, is there any possibility of reducing CAPEX by using a more accurate way of estimating the flare system behaviour?

Why we collect this data:

Inprocess is collecting and may process your personal data for a variety of reasons related to our business and our ability to deliver the best possible products, service and overall user experience. Accordingly, we may use your personal data to administer research surveys, to accurately deliver contracted services, to register you for events, to understand your preferences and to detect and prevent any fraudulent or unauthorized activities. Please refer to Inprocess’ Privacy and Security Policy, which is available here (https://inprocessgroup.com/en/privacy-policy), for more information regarding our collection and processing of your personal data.

Is your company currently an Inprocess client?
Download Success Story

Interested? Don’t hesitate to ask for more information just completing the form below

Supporting the development of plant operators’ competence

Description:

Plan and follow-up operators’ professional development by digitizing and centralizing in a single training environment all new and old learning material.
ICOM is a flexible and user-friendly tool that, once implemented, allows the user, not only to manage and run the tool, but to use it to further develop the training itineraries, to expand the documentation and files used for training and to take ownership of the platform to tackle the specific daily needs that HR department and Operations management may have.

Why we collect this data:

Inprocess is collecting and may process your personal data for a variety of reasons related to our business and our ability to deliver the best possible products, service and overall user experience. Accordingly, we may use your personal data to administer research surveys, to accurately deliver contracted services, to register you for events, to understand your preferences and to detect and prevent any fraudulent or unauthorized activities. Please refer to Inprocess’ Privacy and Security Policy, which is available here (https://inprocessgroup.com/en/privacy-policy), for more information regarding our collection and processing of your personal data.

Is your company currently an Inprocess client?
Download Success Story

Interested? Don’t hesitate to ask for more information just completing the form below

Lifecycle Modelling: Using Simulation Models from Engineering Design to Plant Operations

Description:

Plant operators need deep training before the greenfield plant is started-up. Moreover, companies need to diminish potential operational problems related to the equipment sizing, control logic and safety systems by performing early analysis during the engineering design phases.

Why we collect this data:

Inprocess is collecting and may process your personal data for a variety of reasons related to our business and our ability to deliver the best possible products, service and overall user experience. Accordingly, we may use your personal data to administer research surveys, to accurately deliver contracted services, to register you for events, to understand your preferences and to detect and prevent any fraudulent or unauthorized activities. Please refer to Inprocess’ Privacy and Security Policy, which is available here (https://inprocessgroup.com/en/privacy-policy), for more information regarding our collection and processing of your personal data.

Is your company currently an Inprocess client?
Download Success Story

Interested? Don’t hesitate to ask for more information just completing the form below

Ensuring High-Availability in Gas Turbine Power Systems

Description:

Gas turbine power plants have to achieve high reliability and maximum availability in order to be able to meet the dispatch requirements of electric grids at short notice. The power generation systems are high-availability assets, generally above 90%. This high availability requirement means that the possibility of a single unit trip occurring, let alone a cascade of trips, should be minimized as much as possible.

Why we collect this data:

Inprocess is collecting and may process your personal data for a variety of reasons related to our business and our ability to deliver the best possible products, service and overall user experience. Accordingly, we may use your personal data to administer research surveys, to accurately deliver contracted services, to register you for events, to understand your preferences and to detect and prevent any fraudulent or unauthorized activities. Please refer to Inprocess’ Privacy and Security Policy, which is available here (https://inprocessgroup.com/en/privacy-policy), for more information regarding our collection and processing of your personal data.

Is your company currently an Inprocess client?
Download Success Story

Interested? Don’t hesitate to ask for more information just completing the form below